NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS
I-90: BEGINNING WEDNESDAY, MAY 2,
2012,
EAST OF SUPERIOR TO
NINEMILE
BRIDGE. ADDITIONAL ROAD AND BRIDGE CONSTRUCTION BEGINS
ON I-90 BETWEEN MILE POSTS 4.6 AND 81. THERE WILL BE SINGLE LANE
CLOSURES, TWO WAY TRAFFIC AND REDUCED SPEED LIMITS.
EASTBOUND AND WESTBOUND LOADS
OVER 12’
WIDE WILL ONLY BE ALLOWED THROUGH THE CONSTRUCTION AREAS MONDAY THROUGH
THURSDAYS WITH THE FOLLOWING RESTRICTIONS:
WESTBOUND LOADS OVER 12’ IN WIDTH ARE REQUIRED TO STAGE IN THE SIGNED STAGING AREA
AT MILE POST 63. AT 5 A.M. THE STAGED LOADS WILL BE PILOTED THROUGH THE
CONSTRUCTION TO MILE POST 52. THESE LOADS WILL THEN STAGE AT THE HAUGEN
WEIGH SCALE AT MILE POST 15. AT 6:15 A.M. THESE LOADS WILL BE PILOTED
THROUGH THE CONSTRUCTION TO MILE POST 5.7. ANY OVERSIZED LOAD MISSING THE
DESIGNATED PILOTING TIMES WILL BE REQUIRED TO WAIT UNTIL THE NEXT OPENING TO BE
ESCORTED THROUGH THE PROJECT.
EASTBOUND LOADS OVER 12’ IN WIDTH ARE REQUIRED TO STAGE IN THE SIGNED STAGING AREA
AT MILE POST 4.6. AT 5 A.M. THE STAGED LOADS WILL BE PILOTED THROUGH THE
CONSTRUCTION TO MILE POST 13. THESE LOADS WILL THEN STAGE IN THE SIGNED
STAGING AREA AT MILE POST 52. AT 6:15 A.M. THE STAGED LOADS WILL BE PILOTED
THROUGH THE CONSTRUCTION TO MILE POST 63. ANY OVERSIZED LOAD MISSING THE
DESIGNATED PILOTING TIMES WILL BE REQUIRED TO WAIT UNTIL THE NEXT OPENING TO BE
ESCORTED THROUGH THE PROJECT.
WIDTH RESTRICTIONS LIFTED/COMPLETED:
ROAD CONSTRUCTION AND RESTRICTIONS:
I-90:
DEER LODGE EAST AND WEST MP 184.9 AND
189. EAST AND WEST OF DEER LODGE ON I-90
MM 184.9 AND 187. GUARDRAIL WORK IN PROGRESS. THERE IS A WIDTH RESTRICTION OF 14 FEET.
EXPECT DETOUR, REDUCED SPEED TO 35 MPH, SINGLE LANE CLOSURES, TRAFFIC CONTROLLED
BY SIGNAL LIGHTS, FLAGGERS. BRIDGE AND MEDIAN WORK STARTING DATE APRIL 18,
2012. EXPECT MEDIAN CROSSOVERS, TWO WAY TRAFFIC AND A 14' WIDE RESTRICTION.
WIDE LOAD DETOUR IS SET UP AT THE NORTH DEER LODGE INTERCHANGE MP 184 AND THE
SOUTH DEER LODGE INTERCHANGE AT MP 187. IF WIDE LOAD ACCOMMODATIONS NEED TO BE
MADE, CALL TODD ENDY AT MOUNTAIN WEST TRAFFIC CONTROL AT 406-498-3368.
I-15:
THERE WILL BE A 14 FOOT WIDTH RESTRICTION.
LOADS OVER 14 IN WIDTH WILL NEED TO
DETOUR: NORTHBOUND WIDE LOADS WILL BE DETOURED ALONG HWY 287 STARTING AT
EXIT 228. THEY WILL CONTINUE ALONG 287
TO MT 200 AT BOWMAN’S CORNER WHERE THEY WILL BE DIRECTED TO VAUGHN. FROM VAUGHN THEY WILL PROCEED TO NORTH
I-15. SOUTHBOUND WIDE LOADS WILL BE
DETOURED AT EXIT-240. THEY WILL CONTINUE
ON MT-200, TO BOWMAN’S CORNER, TO US-287 TO EXIT-228 AND WILL PRECEDE SOUTH ON
I-15.
I-15:
SOUTH OF DIVIDE AT MP 93.9 NORTH TO MP
102.9 NORTH OF DIVIDEWEATHER PERMITTING PROJECT WILL RESUME ON 4/11 OR 4/16
GUARDRAIL MILLING PAVING 16’ LANE WIDTH
REDUCED SPEED 55 SINGLE LANE TRAFFIC.
I-15:
HELENA
– CUSTER INTERCHANGE, MP 193.2 TO 194.4. (CARLSON) BRIDGE WORK. NHI ROUTE I-15 BEGINNING AT RP
193.2 AND EXTENDING TO RP 194.4. THIS PROJECT ALSO INCLUDES WORK ON CUSTER AVE
(STATE URBAN ROUTE 5802) BEGINNING AT RP 1.4 AND EXTENDING TO RP 3.0. CUSTER
AVENUE TRAFFIC IS SHIFTED TO THE NEW CANAL STRUCTURE. CROSSOVERS ARE ACTIVE ON
I-15. EXPECT A WIDTH RESTRICTION OF 14 FEET, A REDUCED SPEED OF 35 MPH AND INTERSECTION WORK.
OVERSIZED LOADS CAN BE ACCOMMODATED ON I-15 BY CALLING STEVE (406-207-0855)
6:00 AM TO 6:00 PM AND JERRY (406-207-0858) OVERNIGHT TO COORDINATE MOVEMENT
THROUGH THE PROJECT. CUSTER AVENUE WILL NOT BE ABLE TO HANDLE OVERSIZED LOADS,
ESPECIALLY ON THE EAST SIDE OF THE INTERCHANGE. THE PROJECT IS AHEAD OF
SCHEDULE AND THE CONTRACTOR WILL BE CLOSING THE CUSTER BRIDGE MIDNIGHT ON
SATURDAY, APRIL 14TH. THE CONTRACTOR WILL IMMEDIATELY CLOSE CUSTER AVENUE
FROM SANDERS TO WASHINGTON. THEY WILL THE BEGIN REMOVING THE BRIDGE AT 4AM
SUNDAY MORNING. THEIR GOAL IS TO HAVE THE ENTIRE BRIDGE REMOVED (DECK,
PILLARS AND ABUTMENTS) BY 8PM SUNDAY NIGHT. WITH THIS ACCELERATED SCHEDULE, PHASE TWO OF THE PROJECT SHOULD BE
COMPLETE WELL BEFORE THE 4TH OF JULY HOLIDAY.
US-12: BEGINNING AT FORSYTH RUNNING 12
MILES NORTHWEST, RECONSTRUCTION ACTIVITY IS IN PROGRESS, EXPECT 10 MINUTE
DELAYS, A DETOUR, LOOSE GRAVEL, AND REDUCED SPEED TO 35 MPH, 11 FOOT
WIDTH RESTRICTION EXPECTED TO BE IN PLACE BY MARCH 28TH. (
US-2: MILE MARKER 626.1 TO 632.9 BROCKTON-EAST. MISCELLANEOUS WORK IN PROGRESS. THERE IS A WIDTH RESTRICTION OF 12 FEET. EXPECT LOOSE GRAVEL, REDUCED SPEED TO 35 MPH, GRAVEL SURFACE, ROUGH ROADWAY SURFACE.
US
287: NH ROUTE 8 NORTHWEST OF THREE FORKS FROM MP 107.3
TO 108.9. RECONSRTUCTION WIDTH
RESTRICTION 11 FEET, BRIDGE,
FENCING, SEEDING, AND MEDIAN WORK.
REDUCED SPEED 35MPH, SINGLE LANE TRAFFIC, SINGLE LANE CLOSURES, WIDE
LOADS NORTHBOUND ON US 287 MUST USE THE EAST THREE FORKS INTERCHANGE TO CROSS
I-90, WIDE LOADS SOUTHBOUND ON US 287 MUST USE MILLIGAN CANYON INTERCHANGE TO
CROSS I-90
MT-41:
TWIN BRIDGES MP 27 TO 13 MILES SOUTH OF
TWIN BRIDGES. TWIN BRIDGES AT MM 27 TO
13 MILES SOUTH OF TWIN BRIDGES. GUARDRAIL WORK IN PROGRESS. THERE IS A WIDTH RESTRICTION OF 9 FEET.
EXPECT DETOUR, REDUCED SPEED TO 35 MPH, SINGLE LANE CLOSURES, TRAFFIC
CONTROLLED BY SIGNAL LIGHTS, FLAGGERS. BRIDGE AND MEDIAN WORK IN PROGRESS. WIDE
LOADS OVER 9 FEET MUST USE I-15 DETOUR. BRIDGE LOCATION- HWY 41, 13 MILES SOUTH
OF TWIN BRIDGES STARTING APRIL 21, 2012 BRIDGE LOCATION- HWY 41 AT TWIN BRIDGES
AT MM 27 STARTING APRIL 30, 2012.
US 191: SLIDES SOUTH OF MOBRIDGE FROM MILE POST
84.0 TO 85.7 – APPROXIMATELY 3 MILES SOUTH OF THE MISSOURI RIVER (FRED
ROBINSON) BRIDGE. CONTRACTOR WORK TO INCLUDE: EARTHWORK, SPECIAL BORROWS,
JACKING AND BORING PIPE INSTALLATIONS, SURVEYING AND MISCELLANEOUS WORK.
TRAVELERS SHOULD EXPECT ROUGH ROADWAY, OF GRAVEL SURFACE AND UNEVEN PAVEMENT
SPOTS RESULTING FROM THE CONTINUING SLIDE MOVEMENTS THIS FALL. HEIGHT AND WIDTH RESTRICTIONS HAVE BEEN
LIFTED, ROAD IS OPEN TO TWO LANE TRAFFIC, AND SIGNAL LIGHTS HAVE BEEN REMOVED
HOWEVER, THERE WILL STILL BE NO OVERWEIGHT LOADS ALLOWED ON THIS ROADWAY UNTIL REPAIRS ARE COMPLETE.
US-191: MILE MARKER 84 TO 85.7 SLIDES 3
MILES SOUTH OF MISSOURI RIVER (FRED ROBINSON) BRIDGE. RECONSTRUCTION WORK IN PROGRESS. THERE IS A WIDTH
RESTRICTION OF 12 FEET, A WEIGHT RESTRICTION OF 8 TONS. EXPECT DELAYS UP TO 15 MINUTES, LOOSE GRAVEL,
REDUCED SPEED TO 35 MPH, ROUGH ROADWAY SURFACE, SINGLE LANE TRAFFIC, SINGLE
LANE CLOSURES, TRAFFIC CONTROLLED BY SIGNAL LIGHTS, FLAGGERS. SLIDE REPAIR. NO OVERWEIGHT LOADS ARE ALLOWED
UNTIL REPAIRS ARE FINISHED. EXPECT UNEVEN SPOTS IN PAVEMENT DUE TO SLIDE
MOVEMENT, A WIDTH RESTRICTION OF TWELVE FEET THROUGHOUT THIS PROJECT.
US 87: WINDHAM EAST MILE POST 47.2 TO 57.8 FROM 1 MILE WEST OF HOBSON TO 11.5 MILES
WEST OF HOBSON. CURRENT WORK INCLUDES SURVEYING, SALVAGING TOPSOIL, BRIDGE
WORK, AND MISCELLANEOUS ACTIVITIES.
TRAVELERS SHOULD EXPECT A
12 FOOT WITH RESTRICTION, AND A 15 FOOT HEIGHT RESTTRICTION. DELAYS, SINGLE LANE TRAFFIC, SINGLE LANE
CLOSURES, REDUCED SPEEDS, PILOT CARS, FLAGGERS, AND TRAFFIC CONTROLLED BY
SIGNALS LIGHTS. MOTORCYCLES MAY WANT TO
CONSIDER AN ALTERNATE ROUTE.
US-87: BETWEEN BELT AND RAYNESFORD ( EB AND WB): THERE IS A WIDTH RESTRICTION
OF 12 FEET WIDE. THE DETOURES FOR EB AND WB ARE: 1) WB: RAYNESFORD, MT (WB
DETOURED) TO GREAT FALLS, MT: U-87, S-427, US-89, US-87. 2) EB: GREAT FALLS, MT
(EB DETOURED) TO RAYNESFORD, MT: US-87, US-89, S-427, US-87 (THIS IS A
PERMANENT RESTRICTION)
MT-83: MILE MARKER 5 TO 11 SEELEY LAKE SOUTH MP 5 TO
MP 11. MISCELLANEOUS WORK IN PROGRESS. THERE IS A WIDTH RESTRICTION OF 12 FEET. EXPECT REDUCED SPEED TO 35 MPH, PILOT CARS,
SINGLE LANE TRAFFIC, TRAFFIC CONTROLLED BY SIGNAL LIGHTS. DRILL GEOTECHNICAL BORINGS. WORK IS SCHEDULED
TO BEGIN ON MONDAY, APRIL 30, 2012. DRILLING WILL BEGIN IN THE SOUTHBOUND LANE
FROM APPROXIMATELY MP 5 TO MP 11. THIS PROJECT IS EXPECTED TO LAST 4 WEEKS,
WEATHER DEPENDING. TRAFFIC CONTROL AND PILOT CAR WILL BE PROVIDED BY MOUNTAIN
WEST HOLDING CO. ALL LOADS OVER 12 FEET WIDE WILL HAVE TO CHOOSE AN ALTERNATE
ROUTE. WORK SCHEDULE WILL BE MONDAY THRU THURSDAY FROM 7:00 AM TO 5:30 PM.
WIDTH RESTRICTIONS IS IN EFFECT DURING WORK HOURS ONLY. OVERSIZED LOADS WILL BE
ABLE TO TRAVEL AFTER 5:30 PM AND ON FRIDAYS.
MT-35: ALL
LOADS OVER 9 FEET WIDE TRAVELING
BETWEEN POLSON AND BIGFORK WITH THE EXCEPTION OF LOADS THAT ARE ORIGINATING OR
ARE BEING DELIVERED BETWEEN POLSON AND BIGFORKS.
US-2: MM 120.2 TO 120.8 (WEST IDAHO STREET – DOWNTOWN KALISPELL) NEXT FRIDAY, APRIL 20TH,
EASTBOUND TRAFFIC WILL ALSO BE REDUCED TO ONE LANE. LATE SUNDAY, APRIL 22ND, THE
TRAVEL LANES WILL BE MOVED TO THE SOUTH HALF OF THE ROAD. BOTH EASTBOUND AND WESTBOUND WILL HAVE A 12’ WIDTH RESTRICTION PORTABLE TRAFFIC
SIGNALS WILL BE IN PLACE AT MERIDIAN AND 5TH AVENUE WEST. LEFT TURNS WILL BE PROHIBITED IN THE WORK
ZONE AND THIS WILL BE ENFORCED BY KALISPELL POLICE DEPARTMENT. THIS TRAFFIC CONFIGURATION WILL REMAIN IN
EFFECT UNTIL APPROXIMATELY MID-MAY.
MILLING OPERATIONS WILL BEGIN ON THE NORTH HALF OF THE ROADWAY ON
MONDAY, APRIL 23RD. TRAVELERS SHOULD CONSIDER ALTERNATE ROUTES.
MT-72: FROM 16 MILES NORTH OF THE WYOMING STATE LINE
TO JCT. WITH 310 - CONTRACTOR IS WORKING ON NEW ALIGNMENT
AND IRRIGATION PIPE. MOTORISTS MAY EXPECT REDUCED SPEED, ROUGH ROADWAY SURFACE,
LOOSE GRAVEL AND GRAVEL SURFACE. WIDTH
RESTRICTION OF 14 FT.
S-205: OLD
HIGHWAY 10 MILE MARKER 5.2 TO 11.7 LOGAN TO 1/2 MILES EAST OF MANHATTAN.
OVERLAY WORK IN PROGRESS. THERE
IS A WIDTH
RESTRICTION OF 10 FEET. EXPECT DETOUR, LOOSE GRAVEL, REDUCED SPEED TO
35 MPH, PILOT CARS, GRAVEL SURFACE, SINGLE LANE TRAFFIC, GROOVED SURFACE,
FLAGGERS. PROJECT SCHEDULED TO BEGIN
APRIL 2, 2012.
S-288: CHURCHHILL ROAD MILE MARKER 0 TO 6.1 AT THE
INTERSESTION WITH I-90 TO 6 MILES SOUTH OF I-90. OVERLAY WORK IN PROGRESS. THERE IS A WIDTH RESTRICTION OF 10 FEET. EXPECT FRESH
OIL, LOOSE GRAVEL, REDUCED SPEED TO 35 MPH, PILOT CARS, GRAVEL SURFACE, ROUGH ROADWAY SURFACE, SINGLE LANE
TRAFFIC, GROOVED SURFACE, INTERSECTION WORK, FLAGGERS. PROJECT SCHEDULED TO BEGIN APRIL 2, 2012.
X-81018
– HYSHAM-EAST FRONTAGE ROAD. MP 0.0 TO 10.5 OVERLAY & CHIP SEAL. 11 FOOT WIDTH RESTRICTION STARTING
4/30/2012. MOTORISTS MAY EXPECT REDUCED
SPEED, LOOSE GRAVEL, SINGLE LANE TRAFFIC, PILOT CARS AND FLAGGERS.
HELENA
AREA: THERE IS
ALSO AN 11
FOOT WIDTH RESTRICTION FROM WASHINGTON STREET TO YORK ROAD
TURNOFF.
ROAD
CLOSURES:
MT-19/US-191 NORTH OF GRASS RANGE: IS CLOSED FOR OVERWEIGHT LOADS TILL FURTHER NOTICE.
S-261: EFFECTIVE
IMMEDIATELY: S-261 IS CLOSED FROM WIBAUX TO SIDNEY
US-12:
EFFECTIVE IMMEDIATELY THERE ARE NO OVERSIZE OR OVERWEIGHT LOADS ALLOWED FROM
TOWNSEND TO THE JUNCTION OF US-12/89 (9 MILE Y) UNTIL FURTHER NOTICE.
DIVIDE,
MONTANA : PUMP HOUSE ROAD ON MT 43, RT X47017,
THREE MILES WEST OF DIVIDE: THE BRIDGE IS
CLOSED DUE TO SAFETY CONCERNS. ACCESS
STILL AVAILABLE FOR RESIDENTS FROM THE EAST SIDE OF THE BRIDGE.