MONTANA CONSTRUCTION REPORT
07/03/2012
ROAD CLOSURES/INCIDENTS DUE TO FIRES
PLEASE CHECK OUR WEBSITE
FOR MORE UP TO DATE CLOSURES AND INFORMATION
http://www.mdt.mt.gov/travinfo/scripts/alerts.pl
US-212
|
ROAD CLOSED
|
LAME DEER to broadus.
road closed due to fire , mp 42.1 to 103.4
|
NEW/UPDATED ROAD
CONSTRUCTION AND RESTRICTIONS:
US-87
|
12’ WIDTH
STARTS 07/09/12
|
P-16 US 87 SOUTH OF ROUNDUP SOUTH
MILE POST 38.2 TO 46.2 – FROM ROUNDUP TO 8 MILES SOUTH OF ROUNDUP THIS
MILLING/PAVING PROJECT WILL BEGIN ON JULY 9, 2012. PROJECT WILL HAVE A 12 FOOT WIDTH RESTRICTION, DELAYS,
REDUCED SPEEDS OF 35 MPH, PILOT CARS, FLAGGERS AND TRAFFIC CONTROLLED BY
SIGNAL LIGHTS. THERE WILL BE GROOVED
SURFACES WITH WORKERS AND EQUIPMENT ON THE ROADWAY. MOTORCYCLES MAY WANT TO CHOOSE AN ALTERNATE
ROUTE
|
WIDTH RESTRICTIONS
LIFTED/COMPLETED:
ROAD CONSTRUCTION AND RESTRICTIONS:
I-90
|
ID/MT I-90
|
ID/MT BORDER TO
EAST OF SUPERIOR TO NINEMILE BRIDGE.
BETWEEN MP 4.6 AND 81. EASTBOUND AND WESTBOUND LOADS OVER 12’ WIDE
WILL ONLY BE ALLOWED THROUGH THE CONSTRUCTION AREAS MONDAY THROUGH THURSDAYS
WITH THE FOLLOWING RESTRICTIONS:
|
I-90
|
12’ WIDTH
WESTBOUND
MON-THUR
MP 4.6 TO MP 81
|
WESTBOUND LOADS
OVER 12’ IN WIDTH ARE REQUIRED TO
STAGE IN THE SIGNED STAGING AREA AT MILE POST 63. AT 5 A.M. THE STAGED
LOADS WILL BE PILOTED THROUGH THE CONSTRUCTION TO MILE POST 52. THESE
LOADS WILL THEN STAGE AT THE HAUGEN WEIGH SCALE AT MILE POST 15. AT
6:15 A.M. THESE LOADS WILL BE PILOTED THROUGH THE CONSTRUCTION TO MILE POST
5.7. ANY OVERSIZED LOAD MISSING THE DESIGNATED PILOTING TIMES WILL BE
REQUIRED TO WAIT UNTIL THE NEXT OPENING TO BE ESCORTED THROUGH THE PROJECT.
|
I-90
|
12’ WIDTH
EASTBOUND
MON-THUR
MP 4.6 TO MP 81
|
EASTBOUND LOADS
OVER 12’ IN WIDTH ARE REQUIRED TO
STAGE IN THE SIGNED STAGING AREA AT MILE POST 4.6. AT 5 A.M. THE
STAGED LOADS WILL BE PILOTED THROUGH THE CONSTRUCTION TO MILE POST 13.
THESE LOADS WILL THEN STAGE IN THE SIGNED STAGING AREA AT MILE POST 52.
AT 6:15 A.M. THE STAGED LOADS WILL BE PILOTED THROUGH THE CONSTRUCTION TO
MILE POST 63. ANY OVERSIZED LOAD MISSING THE DESIGNATED PILOTING TIMES,
WILL BE REQUIRED TO WAIT UNTIL THE NEXT OPENING TO BE ESCORTED THROUGH THE
PROJECT. EASTBOUND LOADS OVER 12’ IN WIDTH MUST CONTINUE EAST AND PASS ACROSS
THE BRIDGE AT MILE POST 81 PRIOR TO 7 A.M. LOADS NOT MEETING THIS
DEADLINE WILL HAVE TO WAIT UNTIL THE NEXT OPENING, PRIOR TO 7 A.M., TO PASS
THROUGH THE PROJECT. (EFFECTIVE MAY 30, 2012).
|
I-90
|
10’ WIDTH
WESTBOUND
MON-THUR
MP 63 TO MP 48
|
BEGINNING THURSDAY, JULY 12, 2012, ADDITIONAL RESTRICTIONS WILL BE IN PLACE FOR WESTBOUND
WIDE LOADS BETWEEN MILE POST 63 AND MILE POST 48.
WESTBOUND LOADS OVER 10’ IN WIDTH ARE REQUIRED TO STAGE IN THE SIGNED STAGING AREA AT MILE
POST 63. AT 5 A.M. THE STAGED LOADS WILL BE PILOTED THROUGH THE
CONSTRUCTION TO MILE POST 48. ANY OVERSIZED LOAD MISSING THE DESIGNATED
PILOTING TIMES WILL BE REQUIRED TO WAIT UNTIL THE NEXT OPENING TO BE ESCORTED
THROUGH THE PROJECT. FOR CONSTRUCTION AREAS WEST OF MILE POST 48,
THE OVER 12’ WIDTH RESTRICTION IS IN PLACE AND PILOTING THROUGH THE PROJECT
IS AS SHOWN IN THE MAY 2, 2012 WIDE LOAD UPDATE.
|
I-90
|
16’ WIDTH
|
US 287/NH ROUTE 8
WEST OF THREE FORKS INTERCHANGE
FROM MP 107.3 TO 108.9, WIDTH
RESTRICTION 11’, REDUCED SPEED 45 MPH ,WIDE LOADS NORTH BOUND
ON US 287 MUST USE THE EAST THREE FORKS INTERCHANGE TO CROSS I-90. WIDE LOADS
SOUTH BOUND ON US 287 MUST USE MULLIGAN CANYON INTERCHANGE TO CROSS I-90.
TWO-WAY TRAFFIC ON I-90 ONE MILE EAST AND WEST OF THE WEAT THREE FORKS
INTERCHANGE. SPEEDS REDUCED TO 45 MPH ON I-90 WIDTH RESTRICTIONS ON I-90 OF 16’.
WIDE LOADS ON I-90 WILL NEED TO
CONTRACT GAYLEN BAUMBERGER AT (406) 207-0856. EMERGENCY CONTACTS: PRIME
CONTRACTOR-OFFICE (406)761-7920, PROJECT ENGINEER RUSS ROBERTSON
(406)868-7429. TRAFFIC CONTROL OFFICE
(406)721-6644, SUPERVISOR GAYLEN BAUMGARTNER (406)207-0863
|
I-90
|
14’ WIDTH
|
EAST AND WEST OF DEER LODGE ON I-90 MM
184.9 AND 187. GUARDRAIL WORK IN PROGRESS. THERE IS A WIDTH
RESTRICTION OF 14 FEET. WIDE LOAD DETOUR IS SET UP AT THE
NORTH DEER LODGE INTERCHANGE MP 184 AND THE SOUTH DEER LODGE INTERCHANGE AT
MP 187. IF WIDE LOAD ACCOMMODATIONS NEED TO BE MADE, CALL MOUNTAIN WEST
TRAFFIC CONTROL AT (406) 490-8390,
24 HOURS IN ADVANCE.
|
I-94
|
16’ WIDTH
|
I-94 BALLANTINE
TO POMPEY’S PILLAR - MP 13.1
TO 23.9 CHIP SEAL OPERATIONS WILL BEGIN MONDAY, JUNE 25TH FROM 6:30 A.M.
TO 8:30 P.M. MOTORISTS MAY EXPECT
SINGLE LANE TRAFFIC, REDUCED SPEED, LOOSE GRAVEL AND FRESH OIL. WIDTH RESTRICTION 16 FT.
|
I-15
|
14’ WIDTH
|
I-15, HELENA – CUSTER INTERCHANGE, MP 193.2 TO 194.4.
(CARLSON) LANDSCAPING, PAINT, SEWER WORK, AND MISCELLANEOUS CONSTRUCTION THIS
WEEK. EXPECT LOOSE GRAVEL AND FRESH OIL ON I-15 IN THE VICINITY OF THE CUSTER
INTERCHANGE BRIDGE, ALL RAMPS, WASHINGTON ST AND THE FRONTAGE ROAD. WIDTH
RESTRICTION OF 14 FEET REMAINS IN PLACE. OVERSIZED LOADS CAN
BE ACCOMMODATED BY CALLING STEVE (406-207-0855) OR JERRY (406-207-0858)..
|
I-15
|
16’ WIDTH
|
MILE MARKER 102.9 TO 115.8 FEELY INTERCHANGE- NORTH & SOUTH. BRIDGE WORK IN PROGRESS. THERE IS A WIDTH RESTRICTION OF 16 FEET. EXPECT REDUCED SPEED TO 35 MPH, SINGLE LANE
TRAFFIC. GUARDRAIL AND PAVING. TRAFFIC
CONTROL-MOUNTAIN WEST-TODD ENDY (406)782-1422 OR (406)498-3368.
|
I-15
|
14’ WIDTH
|
JUNCTION OF I-15/US-287 TO CRAIG.
THERE WILL BE A 14 FOOT WIDTH RESTRICTION.
TWO LANE TRAFFIC WILL BE IN THE NORTHBOUND LANE. LOADS WILL BE
BROUGHT THROUGH THE PROFECT BETWEEN 7:00 AM AND 9:00 ON MONDAY THROUGH
THURSDAY. WIDE LOAD ACCOMODATIONS MUST BE MADE BY CALLING KEITH JOHNSTON WITH
MOUNTAIN WEST HOLDINGS AT 406-490-9210.
|
US-287
|
11’ WIDTH
OVER THE BRIDGE
|
US 287/NH ROUTE 8
WEST OF THREE FORKS INTERCHANGE
FROM MP 107.3 TO 108.9, WIDTH
RESTRICTION 11’, REDUCED SPEED 45 MPH ,WIDE LOADS NORTH BOUND
ON US 287 MUST USE THE EAST THREE FORKS INTERCHANGE TO CROSS I-90. WIDE LOADS
SOUTH BOUND ON US 287 MUST USE MULLIGAN CANYON INTERCHANGE TO CROSS I-90.
TWO-WAY TRAFFIC ON I-90 ONE MILE EAST AND WEST OF THE WEAT THREE FORKS
INTERCHANGE. SPEEDS REDUCED TO 45 MPH ON I-90 WIDTH RESTRICTIONS ON I-90 OF 16’.
WIDE LOADS ON I-90 WILL NEED TO CONTRACT GAYLEN BAUMBERGER AT (406) 207-0856.
EMERGENCY CONTACTS: PRIME CONTRACTOR-OFFICE (406)761-7920, PROJECT ENGINEER
RUSS ROBERTSON (406)868-7429. TRAFFIC
CONTROL OFFICE (406)721-6644, SUPERVISOR GAYLEN BAUMGARTNER (406)207-0863
|
US-12
|
11’ WIDTH
|
BEGINNING AT FORSYTH RUNNING 12 MILES
NORTHWEST, RECONSTRUCTION ACTIVITY IS IN PROGRESS, EXPECT 15 MINUTE
DELAYS, A DETOUR, LOOSE GRAVEL, AND REDUCED SPEED TO 35 MPH, PILOT CARS,
GRAVEL SURFACE, AND FLAGGERS AND A 11 FOOT WIDTH RESTRICTION.
|
US-12
|
14’ WIDTH
|
P-14 HARLOWTON SCALE SITE US 12/MT 3
MILE POST 100.5 TO 101.4 (NEAR INTERSECTION OF US 12/MT 3 WITH US 191)
CONTRACTOR IS WORKING ON SCALE SITE, GRADING AND INSTALLING FIRE
HYDRANTS. THERE WILL BE SHORT DELAYS,
REDUCED SPEEDS AND A WIDTH RESTRICTION OF 14 FEET ON US 12
FOR THIS ONE MILE PROJECT. *PM JAY
MUHLBEIER 670-7889 CELL OR 657-0241 OFFICE
|
US-12
|
12’ WIDTH
|
P14 – US 12 – SHAWMUT WEST –
FROM MILE POST 108.0 TO 116.5 – APPROXIMATELY SEVEN MILES EAST OF HARLOWTON’S
JUNCTION OF US 191 & US 12.
TRAVELERS WILL ENCOUNTER EQUIPMENT AND FLAGGERS ON THE ROADWAY,
TRAFFIC CONTROLLED BY SIGNAL LIGHTS, SINGLE LANE TRAFFIC, PILOT CARS, LOOSE
GRAVEL, REDUCED SPEED LIMITS, DETOURS AND SHORT DELAYS. THE MAXIMUM WIDTH
THROUGH THE DETOUR AREAS WILL BE RESTRICTED TO 12 FEET. WORK CONTINUES ON PROJECT DAY AND
NIGHT (24 HOURS A DAY)
|
US-87
|
12’ WIDTH
|
BETWEEN BELT
AND RAYNESFORD (EB AND WB): THERE IS A WIDTH
RESTRICTION OF 12 FEET WIDE. THE DETOURES FOR EB AND WB ARE: 1) WB: RAYNESFORD, MT
(WB DETOURED) TO GREAT FALLS, MT: U-87, S-427, US-89, US-87. 2) EB: GREAT
FALLS, MT (EB DETOURED) TO RAYNESFORD, MT: US-87, US-89, S-427, US-87 (THIS
IS A PERMANENT RESTRICTION)
|
US-191
|
14’ WIDTH
|
P-63 US 191 NORTH OF HARLOWTON- NORTH
MILE POST 7.0 TO 14.2 (FROM 7 MILES NORTH 14.2 MILES NORTH OF HARLOWTON) A
RECONSTRUCTION PROJECT IS IN PROGRESS.
TRAVELERS SHOULD EXPECT A WIDTH RESTRICTION OF 14 FEET DUE TO
CULVERT INSTALLATION; ALSO DELAYS, DETOUR, REDUCED SPEEDS AND A ROUGH ROADWAY
SURFACE. *PM JAY MUHLBEIER 670-7889
CELL OR 657-0241 OFFICE
|
US-191
|
12’ WIDTH
WEIGHT RESTRICTION
|
MP 84 TO 85.7 SLIDES 3 MILES SOUTH OF MISSOURI
RIVER (FRED ROBINSON)
BRIDGE. RECONSTRUCTION WORK IN
PROGRESS. THERE
IS A WIDTH RESTRICTION OF 12 FEET, A WEIGHT RESTRICTION OF 8 TONS. NO OVERWEIGHT LOADS ARE ALLOWED UNTIL
REPAIRS ARE FINISHED. EXPECT UNEVEN SPOTS IN PAVEMENT DUE TO SLIDE MOVEMENT,
A WIDTH RESTRICTION OF TWELVE FEET THROUGH OUT THIS PROJECT.
|
US-2
|
12’ WIDTH
|
MILE MARKER 626.1 TO 632.9 BROCKTON-EAST.
MISCELLANEOUS WORK IN PROGRESS.
THERE IS A WIDTH RESTRICTION OF 12 FEET. EXPECT
LOOSE GRAVEL, REDUCED SPEED TO 35 MPH, GRAVEL SURFACE, AND ROUGH ROADWAY
SURFACE.
|
MT-200
|
NO OVERWEIGHT LOADS
|
FROM JORDAN TO THE
JUNCTION OF S-462: NO OVERWEIGHT LOADS ALLOWED DUE TO A TIMBER BRIDGE WEAKENING (BIG DRY
CREEK BRIDGE).
|
MT-83
|
12’ WIDTH
|
NORTH OF CLEARWATER JCT., FROM
MILEPOST 5 TO MILEPOST 12, EXPECT 35 MPH SPEED LIMITS, SINGLE LANE TRAFFIC,
PILOT CARS, AND SHORT DELAYS. WIDTH RESTRICTION OF 12 FEET VEHICLES OVER 12 FEET WIDE WILL NEED TO
CHOOSE AN ALTERNATE ROUTE ON MONDAY THROUGH
THURSDAY BETWEEN 7:00 A.M. AND 5:30 P.M.
THIS DRILLING PROJECT IS EXPECTED TO LAST FOUR WEEKS, WEATHER
DEPENDING.
|
MT-41
|
10’ WIDTH
|
MILE MARKER 0 TO 27 TWIN BRIDGES AT MM 27 TO 13 MILES SOUTH OF TWIN BRIDGES.
GUARDRAIL WORK IN PROGRESS.
THERE IS A WIDTH RESTRICTION OF 10 FEET. EXPECT DETOUR, REDUCED SPEED TO 35 MPH,
SINGLE LANE CLOSURES, TRAFFIC CONTROLLED BY SIGNAL LIGHTS, FLAGGERS. BRIDGE AND MEDIAN WORK IN PROGRESS. WIDE
LOADS OVER 10 FEET MUST USE I-15 DETOURS.
|
MT-35
|
9’ WIDTH
|
ALL LOADS OVER 9 FEET WIDE TRAVELING BETWEEN POLSON AND BIGFORK WITH THE EXCEPTION
OF LOADS THAT ARE ORIGINATING OR ARE BEING DELIVERED BETWEEN POLSON AND
BIGFORKS.
|
MT-72
|
14’ WIDTH
|
FROM 16 MILES NORTH OF THE WYOMING STATE LINE TO JCT. WITH 310 - MOTORISTS MAY EXPECT REDUCED
SPEED, ROUGH ROADWAY SURFACE, LOOSE GRAVEL AND GRAVEL SURFACE. WIDTH RESTRICTION OF 14 FT.
|
MT-43
|
17’ WIDTH
|
MT 43 BEGINNING AT WISE RIVER MP 65.1 EXTENDING
11.7 MILES EAST TO DIVIDE AT MP 77.2 GUARDRAIL, BRIDGE, WIDTH RESTRICTION 17. REDUCED SPEED 35 MPH, SINGLE LANE TRAFFIC, TRAFFIC CONTROLLED BY SIGNAL LIGHTS.
|
MT-43
|
NO OVERWEIGHT LOAD
|
PUMP
HOUSE ROAD ON MT 43, RT X47017, AND THREE MILES WEST OF DIVIDE: THE BRIDGE IS CLOSED DUE TO SAFETY
CONCERNS. ACCESS STILL AVAILABLE FOR
RESIDENTS FROM THE EAST SIDE OF THE BRIDGE.
|
S-261
|
NO OVERWEIGHT LOAD
|
EFFECTIVE IMMEDIATELY: S-261 IS CLOSED
FROM WIBAUX TO SIDNEY FOR OVERWEIGHT LOADS
|
S-253
|
10’ WIDTH
|
S-253, 1 MILE NORTH OF TERRY,
BRIDGE WORK IS IN PROGRESS, EXPECT A 10 FOOT WIDTH RESTRICTION, REDUCED
SPEEDS OF 35 MPH, SINGLE LANE TRAFFIC AND TRAFFIC CONTROLLED BY SIGNAL LIGHT.
(GOROSKI BH 253-1(21)1)
|
S-421
|
12’ WIDTH
|
SECONDARY 421 -
EAST OF COLUMBUS - MP 0.0 TO 5.96, MILLING AND PAVING THIS WEEK. THERE WILL BE A ROUGH ROADWAY SURFACE AND
SINGLE LANE TRAFFIC. WIDTH
RESTRICTION OF 12 FT.
|
S-540
|
10’ WIDTH
|
S-540 EAST RIVER ROAD: MILE
MARKER 20 TO 25 6 MILES NORTH OF PRAY NEAR STRAWBERRY CREEK EXTENDING 5 MILES
NORTH TO PINE CREEK. OVERLAY WORK IN
PROGRESS. THERE IS A WIDTH RESTRICTION OF 10 FEET. EXPECT DELAYS OF 15 TO 15 MINUTES, FRESH
OIL, LOOSE GRAVEL, REDUCED SPEED TO 35 MPH, PILOT CARS, ROUGH ROADWAY SURFACE,
SINGL E LANE, TRAFFICGROOVED SURFACE, FLAGGERS. THIS PROJECT IS SCHEDULED TO START ON
WEDNESDAY, MAY 30, 2012.
|