MONTANA CONSTRUCTION REPORT
10/10/2012
ROAD INCIDENTS DUE TO FIRES
PLEASE CHECK OUR WEBSITE
FOR MORE UP TO DATE CLOSURES AND INFORMATION
http://www.mdt.mt.gov/travinfo/scripts/alerts.pl
NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:
WIDTH RESTRICTIONS LIFTED/COMPLETED:
I-90
|
12’ WIDTH
|
I-90
I-90: MILE MARKER 53 TO 48 EAST
OF SUPERIOR. BRIDGE WORK IN
PROGRESS. THERE
IS A WIDTH RESTRICTION OF 12 FEET.
EXPECT REDUCED SPEED TO 35 MPH, SINGLE LANE CLOSURES. BEGINNING MONDAY, SEPTEMBER 24, 2012,
VEHICLES OVER 12 FEET WIDE WILL BE NOT
BE ALLOWED THROUGH THE CONSTRUCTION AREA MONDAY THROUGH THURSDAY FROM 7 A.M.
TO 7 P.M. LOADS ECEEDING 12 FEET WIDE
CAN GET THROUGH THE PROJECT BEFORE 7:00 AM AND AFTER 7:00 PM. IF THEY GET THERE AFTER 7:00 AM, THEY WILL HAVE
TO STAY AT THE STAGING AREA MP 52 UNTIL AFTER 7:00 PM.
|
I-90
|
12’ WIDTH
|
I-90
I-90: MILE MARKER 58.5 TO 59 WEST OF TARKIO. BRIDGE
WORK IN PROGRESS. THERE IS A WIDTH RESTRICTION OF 12 FEET. EXPECT REDUCED SPEED TO 35 MPH, SINGLE LANE
CLOSURES. BEGINNING MONDAY,
SEPTEMBER 17, 2012, VEHICLES OVER
12 FEET WIDE WILL BE NOT BE ALLOWED THROUGH THE CONSTRUCTION AREA MONDAY
THROUGH THURSDAY FROM 7 A.M. TO 7 P.M.
LOADS ECEEDING 12 FEET WIDE CAN GET THROUGH THE PROJECT BEFORE 7:00 AM
AND AFTER 7:00 PM. IF THEY GET
THERE AFTER 7:00 AM, THEY WILL HAVE TO STAY AT THE STAGING AREA MP 59
UNTIL AFTER 7:00 PM.
|
ROAD CONSTRUCTION AND RESTRICTIONS:
I-90
|
I-90
MP 4.6 AND MP 22
|
TAFT INTERCHANGE TO NINEMILE INTERCHANGE. BRIDGE WORK
IN PROGRESS. THERE IS A WIDTH RESTRICTION
OF 12 FEET. EXPECT DELAYS
UP TO 30 MINUTES, REDUCED SPEED TO 35 MPH, SINGLE LANE CLOSURES. OVER WIDTH
VEHICLES ARE ONLY ALLLOWED THROUGH THE CONSTRUCTION AREAS MONDAY
THROUGH THURSDAY WITH THE FOLLOWING RESTRICTIONS:
|
I-90
|
12’ WIDTH
MP 4.6 AND
MP 22
|
WESTBOUND LOADS OVER 12 FEET
WIDE MUST STAGE AT THE HENDERSON INTERCHANGE AT MILEPOST 22. AT 6:00 A.M.
THEY WILL BE PILOTED TO MILEPOST 5.7. WESTBOUND LOADS MISSING THE DESIGNATED
PILOTING TIMES MUST WAIT FOR THE NEXT OPENING.
|
I-90
|
12’ WIDTH
MP 4.6 AND
MP 22
|
EASTBOUND LOADS OVER 12 FEET WIDE
MUST STAGE AT MILEPOST 4.6. AT 5 A.M. THEY WILL BE PILOTED TO MILEPOST 22.
ANY OVERSIZED LOAD MISSING THE DESIGNATED PILOTING TIME WILL BE REQUIRED TO
WAIT UNTIL THE NEXT OPENING.
|
I-90
|
12’ WIDTH
MP 81 TO
MP 118
|
I-90 MILE MARKER 81 TO 118 ALBERTON TO CLINTON.
BRIDGE WORK IN PROGRESS. THERE IS A WIDTH
RESTRICTION OF 12 FEET.
EXPECT REDUCED SPEED TO 45 MPH, SINGLE
LANE CLOSURES. BRIDGE
INSPECTIONS AND A 12 FOOT WIDTH RESTRICTION BEGIN MONDAY, OCTOBER 15, 2012.
PROJECT IS SCHEDULED TO BE COMPLETED BY OCTOBER 20, 2012. OVERSIZED LOADS MAY BE ACCOMMODATED BY CALLING JAMIE AT
406-471-0237, 24 HOURS IN ADVANCE.
WORK ON I-90 BRIDGES WILL BE IN EFFECT MONDAY, WEDNESDAY, AND THURSDAY. WORK WILL BEGIN AT 7:30 AM AND CONTINUE
THROUGH THE DAYLIGHT HOURS.
.
|
I-90
|
16’ WIDTH WB / 20’ WIDTH EB
|
I-90 MILE MARKER 347.7 TO 349.5
14 MILES EAST OF LIVINGSTON BETWEEN MILEPOST 347.7 AND 349.5. BRIDGE
WORK IN PROGRESS. EXPECT REDUCED SPEED TO 35 MPH, SINGLE LANE TRAFFIC. THERE IS A WIDTH RESTRICTION OF 16' WESTBOUND,
AND 20’
EASTBOUND. BEGINNING SEPT.
4TH, INTERSTATE TRAFFIC WILL BE REDUCED
TO ONE LANE IN EAST 7 WEST DIRECTION IN THE EASTBOUND AND WESTBOUND SIDE OF
THE INTERSTATE.
INTERSTATE.
|
I-15
|
14’ WIDTH
|
I-15 NB OVER THE MISSOURI RIVER, MP 236. (LAY) STEEL BRIDGE REHABILITATION TO BEGIN WEDNESDAY,
OCT 3RD. THERE WILL BE EQUIPMENT ON AND BELOW THE BRIDGE. EXPECT A REDUCED
SPEED OF 35 MPH THROUGH THE WORK ZONE AND A 14-FOOT WIDTH RESTRICTION FROM 7 AM TO
7 PM, MONDAY
THROUGH THURSDAY. APPROXIMATELY
TWO WEEKS.
|
I-15
|
14’ WIDTH
|
I-15
NB OVER THE MISSOURI RIVER, MP 246. (LAY) STEEL BRIDGE
REHABILITATION TO BEGIN WEDNESDAY, OCT 3RD. THERE WILL BE EQUIPMENT ON AND
BELOW THE BRIDGE. EXPECT A REDUCED SPEED OF 35 MPH THROUGH THE WORK ZONE AND A 14-FOOT
WIDTH RESTRICTION FROM 7 AM TO 7 PM, MONDAY THROUGH THURSDAY LASTING
APPROXIMATELY TWO WEEKS.
|
MT-2
|
10’ WIDTH
|
MT-2 THREE FORKS BUSINESS LOOP P-13. MILE MARKER 93.4
TO 97.1 MT-2 JUNCTION OF US-287 AND THREE FORKS BUSINESS LOOP
P-13. SIGN INSTALLATION WORK IN
PROGRESS. THERE IS A WIDTH RESTRICTION OF 10 FEET. EXPECT DELAYS UP TO 15 MINUTES, REDUCED
SPEED TO 35 MPH, SINGLE LANE TRAFFIC, SINGLE LANE CLOSURES, TRAFFIC
CONTROLLED BY SIGNAL LIGHTS, FLAGGERS.
BEGINNING SEPTEMBER 4TH
LOADS OVER 10' WIDE TRAVELING TO THREE FORKS USE I-90 EXIT 278. THE BRIDGE OVER THE JEFFERSON RIVER AT MM 93.7 ON MT HIGHWAY 2 WILL
HAVE A 10' WIDTH RESTRICTION AND ONE LANE
TRAFFIC TO ACCOMMODATE BRIDGE REHAVILITATION.
TRAFFIC WILL BE CONTROLLED BY FLAGGERS AND TRAFFIC
|
US-12
|
14’ WIDTH
|
US-12: MILE MARKER 63.1 TO 71.7
BETWEEN CHECKERBOARD AND MARTINSDALE. RECONSTRUCTION WIDTH RESTRICTION 14’. DELAYS 0 TO
15 MINUTES, REDUCED SPEED 25 MPH.
PILOT CARS OPERATING BETWEEN MP 63.15 AND MP 68.2, SINGLE LANE
TRAFFIC, GRAVEL SURFACE. WORK
CONTINUES NEXT WEEK AS BEFORE. PILOT
CARS OPERATING BETWEEN MM 63.15 AND 68.2 EXPECT REDUCED SPEEDS AND
DELAYS. BE WARY OF TRUCKS ON
ROAD. PLEASE DRIVE CAREFULLY, WATCH
FOR FLAGGERS AND OBEY CONSTRUCTION SIGNS.
|
US-12
|
14’ WIDTH
|
US-12, MM 12-20
– EAST OF TOWNSEND. ROSS GULCH BRIDGE TO DEEP CREEK BRIDGE. EFFECTIVE MONDAY SEPTEMBER 10.2012. THIS WILL INCLUDE (4) BRIDGES. CORE DRILLING ON BRIDGES. THERE WILL BE A 14’ WIDTH RESTRICTION. SINGLE LANE TRAFFIC. FROM 7:00 A.M. – 7:00 P.M.
|
US-12
|
14’ WIDTH
|
P-14 HARLOWTON SCALE SITE US 12/MT 3
MILE POST 100.5 TO 101.4 (NEAR INTERSECTION OF US 12/MT 3 WITH US 191)
CONTRACTOR IS WORKING ON SCALE SITE, GRADING AND INSTALLING FIRE
HYDRANTS. THERE WILL BE SHORT DELAYS,
REDUCED SPEEDS AND A WIDTH RESTRICTION OF 14 FEET ON US 12
FOR THIS ONE MILE PROJECT. *PM JAY
MUHLBEIER 670-7889 CELL OR 657-0241 OFFICE
|
US-12
|
14’ WIDTH
|
US-12, BEGINNING AT
FORSYTH RUNNING 12 MILES NORTHWEST,
BRIDGE WORK IS IN PROGRESS, EXPECT A 14 FOOT WIDTH RESTRICTION,10 MINUTE
DELAYS, REDUCED SPEED TO 35 MPH, SINGLE LANE TRAFFIC, AND TRAFFIC CONTROLLED
BY SIGNAL LIGHT.
|
US-87
|
16’ WIDTH
|
I-90
US 87-N, NORTH OF BILLINGS, M.P. 11.5 TO 23.5. SHOULDER
WIDENING AND MILLING/OVERLAY .
MOTORISTS MAY EXPECT REDUCED SPEED, SINGLE LANE TRAFFIC, ROUGH ROADWAY
SURFACE AND FLAGGERS AND PILOT CARS. WIDTH
RESTRICTION 16 FEET.
|
US-87
|
12’ WIDTH
|
BETWEEN BELT AND RAYNESFORD (EB AND WB): THERE IS A WIDTH RESTRICTION OF 12 FEET WIDE. THE DETOURES FOR EB AND WB ARE: 1) WB: RAYNESFORD, MT
(WB DETOURED) TO GREAT FALLS, MT: U-87, S-427, US-89, US-87. 2) EB: GREAT
FALLS, MT (EB DETOURED) TO RAYNESFORD, MT: US-87, US-89, S-427, US-87 (THIS
IS A PERMANENT RESTRICTION)
|
US-87
|
12’ WIDTH / 15’ HIGH
|
P-57 US 87/MT 200/MT3 STANFORD EAST & WEST FROM MILE POST 34.4 TO 47.2 APPROXIMATELY 2 MILES WEST OF STANFORD TO 11 MILES EAST OF STANFORD A
CONTRACTED MILLING AND PAVING PROJECT IS IN PROGRESS. TRAVELERS SHOULD EXPECT A WIDTH RESTRICTION
OF 12 FEET, HEIGHT RESTRICTION OF 15 FEET AND MULTIPLE DELAYS OF UP TO 15 MINUTES EACH. THERE WILL BE FRESH OIL, LOOSE GRAVEL,
PILOT CARS, REDUCED SPEEDS OF 35 MPH, SINGLE LANE TRAFFIC AND CLOSURES,
FLAGGERS AND TRAFFIC CONTROLLED BY SIGNAL LIGHTS. MOTORCYCLES MAY WANT TO CONSIDER AN
ALTERNATE ROUTE.
|
US-191
|
14’ WIDTH
|
P-63 US 191 NORTH OF HARLOWTON- NORTH
MILE POST 7.0 TO 14.2 (FROM 7 MILES NORTH 14.2 MILES NORTH OF HARLOWTON) A
RECONSTRUCTION PROJECT IS IN PROGRESS.
TRAVELERS SHOULD EXPECT A WIDTH RESTRICTION OF 14 FEET DUE TO
CULVERT INSTALLATION; ALSO DELAYS, DETOUR, REDUCED SPEEDS AND A ROUGH ROADWAY
SURFACE. *PM JAY MUHLBEIER 670-7889
CELL OR 657-0241 OFFICE
|
US-87
|
12’ WIDTH
|
MT-3 CONCURRENT
WITH US-87/MT-200. MILE MARKER
47.2 TO 57. EAST OF WINDHAM - WEST OF LEWISTOWN. RECONSTRUCTION WORK IN PROGRESS. THERE IS A WIDTH RESTRICTION OF 12 FEET. EXPECT DELAYS UP TO 15 MINUTES, FRESH OIL,
LOOSE GRAVEL, REDUCED SPEED TO 35 MPH, PILOT CARS, SINGLE LANE CLOSURES, INTERSECTION
WORK, TRAFFIC CONTROLLED BY SIGNAL LIGHTS, FLAGGERS, MOTORCYCLES CONSIDER
ANOTHER ROUTE. FROM 1 MILE TO 11.5
MILES WEST OF HOBSON. CONTRACTOR IS CONTINUING PAVING OPERATIONS. DURING THE
WEEK OF SEPTEMBER 4, 201 THERE WILL BE A WIDTH RESTRICTION OF TWELVE FEET FOR
BRIDGE WORK.
TRAFFIC SIGNALS & FLAGGING OPERATIONS WILL REDUCE TRAFFIC TO ONE WAY WITH
PLIOT CARS AND INTERMITTANT DEALYS OF 15 MINUTES. TRAVELERS MAY STILL WANT TO CONSIDER USING
THE DETOUR ROUTE FROM WINDHAM TO HOBSON ON MT SECONDARY 541 & 239 TO
AVOID CONSTRUCTION DELAYS, BUT DETOUR IS NOT REQUIRED.
|
US-191
|
12’ WIDTH
WEIGHT RESTRICTION
|
MP 84 TO 85.7 SLIDES 3 MILES SOUTH OF MISSOURI
RIVER (FRED ROBINSON)
BRIDGE. RECONSTRUCTION WORK IN
PROGRESS. THERE
IS A WIDTH RESTRICTION OF 12 FEET, A WEIGHT RESTRICTION OF 8 TONS PER
SINGLE AXLE 16 TON PER TANDEM.
NO OVERWEIGHT LOADS ARE
ALLOWED UNTIL REPAIRS ARE FINISHED. EXPECT UNEVEN SPOTS IN PAVEMENT DUE
TO SLIDE MOVEMENT, A WIDTH RESTRICTION OF TWELVE FEET THROUGH OUT THIS
PROJECT.
|
MT-16
|
12’ WIDTH
|
MT- 16, CULBERTSON SOUTH AT MILE POST 0 TO 12, PAVING IS IN PROGRESS, EXPECT A 12
FOOT WIDTH RESTRICTION, DELAYS UP TO 15 MINUTES, REDUCED SPEEDS OF
35 MPH, SINGLE LANE TRAFFIC AND TRAFFIC CONTROLLED BY SIGNAL LIGHT.
|
MT-200
|
NO OVERWEIGHT LOADS
|
FROM JORDAN TO THE
JUNCTION OF S-462: NO OVERWEIGHT LOADS ALLOWED DUE TO A TIMBER BRIDGE WEAKENING (BIG DRY
CREEK BRIDGE).
|
MT-35
|
9’ WIDTH
|
ALL LOADS OVER 9 FEET WIDE TRAVELING BETWEEN POLSON AND BIGFORK WITH THE EXCEPTION
OF LOADS THAT ARE ORIGINATING OR ARE BEING DELIVERED BETWEEN POLSON AND
BIGFORKS.
|
S-261
|
NO OVERWEIGHT LOAD
|
EFFECTIVE IMMEDIATELY: S-261 IS CLOSED
FROM WIBAUX TO SIDNEY FOR OVERWEIGHT LOADS
|
MT-83
|
14’ WIDE
|
ON MT-83 FROM CLEARWATER
JUNCTION
TO 5 MILES NORTH OF CLEARWATER JUNCTION, EXPECT 35 MPH SPEED LIMITS, PILOT
CARS, AND SHORT DELAYS. CREWS ARE
RECONSTRUCTING THE ROADWAY. BEGINNING
AUGUST 6TH, 2012, THERE WILL BE A 14 FOOT
WIDTH RESTRICTION.
|
US-212
|
12’ WIDTH
|
US 212, SOUTH OF RED LODGE, M.P. 56.4 TO 64.2. MILL, PAVE
AND CHIP SEAL. MILLING WILL START ON SEPTEMBER 4TH AND PAVING ON SEPTEMBER 6TH. MOTORISTS SHOULD WATCH FOR REDUCED SPEED,
SINGLE LANE TRAFFIC WITH FLAGGERS AND TRAFFIC CONTROLLED BY SIGNAL
LIGHTS. WIDTH RESTRICTION 12 FEET DAYLIGHT HOURS
|
US-310/212
|
12’ WIDTH
|
US 310/212, NORTH OF
YELLOWSTONE RIVER BRIDGE, SOUTH OF LAUREL, M.P. 53.5 TO
54.3. BRIDGE DECK
RESURFACING AND GUARDRAIL WORK WILL CONTINUE
UNTIL SEPTEMBER 29TH. WIDTH
RESTRICTION 12 FEET. THERE WILL BE SINGLE LANE TRAFFIC,
REDUCED SPEED AND FLAGGERS.
|
S-294
|
10’ WIDTH
|
S-294: MILE MARKER 11.1 TO 11.2: 4
MILES SW OF LENNEP. CULVERT
INSTALLATION WORK IN PROGRESS. THERE
IS A WIDTH
RESTRICTION OF 10 FEET.
EXPECT REDUCED SPEED TO 35 MPH, SINGLE LANE TRAFFIC, TRAFFIC
CONTROLLED BY SIGNAL LIGHTS. PROJECT
IS SCHEDULED TO BEGIN OCTOBER 9TH
AT WHICH TIME THERE WILL BE A 10 FOOT RESTRICTION.
|
No comments:
Post a Comment